Garage Conversions

Garage Conversion ADU
The Complete LA Guide

Converting your garage is the fastest, most affordable path to an ADU in Los Angeles. Here is everything you need to know — eligibility, real costs, the permit process, and how to maximize every square foot.

February 2026 14 min read|By Skyline Builders CA Inc.

Why Garage Conversions Win

Of the 14,000+ ADU permits issued in Los Angeles County each year, garage conversions consistently rank as the most popular type — and for good reason. Converting an existing structure eliminates the cost of a foundation, exterior framing, and roofing, which together typically account for 25–35% of a new detached ADU's total budget. That savings translates directly into a lower all-in cost and a faster path to rental income.

California's ADU law, strengthened significantly by AB 2221 and SB 897 in 2023, has made garage conversions even more accessible. Homeowners can now convert an attached or detached garage into a living unit without replacing the parking space that was lost — a rule change that removed one of the biggest historic barriers to conversion in LA's dense neighborhoods.

The key advantage: A garage conversion typically costs $80,000–$130,000 all-in for a 400–600 sq ft unit in LA County, compared to $150,000–$230,000 for a new detached ADU of the same size. You are essentially paying for interior work only.

Garage Conversion

$80K $130K

400–600 sq ft, attached or detached

New Detached ADU

$150K $230K

Same size, new construction

Junior ADU (JADU)

$40K $80K

Interior conversion, shared entrance

Is Your Garage Eligible?

Most single-family lots in LA County with an existing garage are eligible for conversion, but there are several factors that determine whether your specific property qualifies and what the conversion will entail. The most important variables are the garage's existing footprint, its structural condition, and the zoning designation of your lot.

Eligibility FactorRequirementNotes
Lot typeSingle-family or multifamilyBoth qualify under CA ADU law
Garage typeAttached or detachedBoth qualify; detached is more common
Minimum sizeNo state minimumLA City: 150 sq ft habitable minimum
SetbacksExisting nonconforming OKCan't expand footprint without meeting new setbacks
HeightExisting roof height OKCan raise roof up to 16 ft for living space
Parking replacementNot requiredAB 2221 eliminated replacement requirement
Owner-occupancyNot required in LA CountySome cities still require it — verify locally
Historic districtsMay restrict conversionCheck with local planning department
Check your garage's foundation first. Many older LA garages (pre-1980) were built on a simple slab that may not meet current residential code for habitable space. A structural engineer inspection ($500–$1,200) before you commit to a conversion can save you from a costly surprise mid-project.

Full Cost Breakdown

The following breakdown reflects actual costs for a standard 500 sq ft single-car garage conversion in LA County in 2026. These are not national averages — they reflect LA labor rates, LA permit fees, and LA material costs from suppliers including Home Depot Pro and local lumber yards.

Cost CategoryLow EstimateHigh EstimateNotes
Architectural plans & design$4,500$8,000ADU-specific plans required for permit
Structural engineering$500$1,200Required if modifying walls or roof
Permit fees (LA County)$3,500$6,500Varies by sq ft and jurisdiction
School fees$1,200$2,800Levied per sq ft of new habitable space
Demolition & site prep$2,000$4,500Garage door removal, slab prep
Framing & insulation$8,000$14,000New interior walls, ceiling, R-38 insulation
Electrical (new panel circuit)$4,500$8,000Dedicated sub-panel or circuit extension
Plumbing (new bathroom & kitchen)$12,000$22,000Largest variable; depends on distance to main line
HVAC (mini-split system)$3,500$6,500Ductless mini-split standard for conversions
Windows & exterior door$3,000$6,000Egress windows required for bedrooms
Drywall, paint & flooring$6,000$11,000LVP flooring, smooth drywall, two-coat paint
Kitchen (prefab cabinets + quartz)$8,000$14,000See kitchen detail below
Bathroom(s)$6,000$12,000Per bathroom; tile, fixtures, vanity
Exterior finish & waterproofing$2,500$5,000Stucco patch, paint, weatherproofing
Landscaping & concrete$1,500$4,000Pathway, entry, any concrete work
Contingency (10%)$6,700$12,250Always budget for surprises
TOTAL$73,900$137,750500 sq ft garage conversion, LA County 2026
The $13K permit reality: Plans, structural engineering, permit fees, and school fees together typically run $9,700–$18,500 for a garage conversion — before a single nail is driven. Budget this as a fixed cost regardless of how simple the conversion appears.

The LA Permit Process

Garage conversions in Los Angeles County require a building permit and, in most cases, separate mechanical, electrical, and plumbing permits. The process is managed by either the LA County Department of Regional Planning (for unincorporated areas) or the city's building department (for incorporated cities like LA City, Culver City, Inglewood, etc.).

Under AB 2221, agencies are required to approve or deny ADU applications within 60 days of receiving a complete application. In practice, LA County and LA City have streamlined their ADU review processes significantly since 2020, and many straightforward garage conversions are approved in 4–8 weeks.

StepWhat HappensTypical Duration
1. Pre-application researchVerify zoning, setbacks, utility connections1–2 weeks
2. Architectural plansLicensed designer or architect prepares permit-ready drawings2–4 weeks
3. Plan check submissionSubmit to building department; pay plan check fee1 week
4. Plan check reviewBuilding department reviews for code compliance3–6 weeks (LA County)
5. Permit issuancePay permit fees; receive permit1 week after approval
6. ConstructionBuild per approved plans; schedule inspections8–14 weeks
7. Final inspection & certificate of occupancyFinal sign-off from building inspector1–2 weeks
Total timelineFrom plans to certificate of occupancy5–8 months typical
Tip: Submit your plans as a complete package on the first attempt. Incomplete submissions trigger a correction notice and restart the review clock. A contractor who has done 50+ LA County ADU permits will know exactly what the plan checker is looking for and can dramatically reduce back-and-forth.

Setbacks & Zoning Rules

One of the most important advantages of a garage conversion is the nonconforming structure exemption. Under California law, if your existing garage does not meet current setback requirements, you can still convert it to an ADU without bringing it into conformance — as long as you are not expanding the footprint. This is a significant benefit in older LA neighborhoods where garages were built close to property lines.

RuleLA County StandardKey Exception
Rear setback5 ft minimum for new ADUExisting structure: 0 ft OK if not expanding
Side setback4 ft minimum for new ADUExisting structure: 0 ft OK if not expanding
Front setbackMust match primary dwellingGarage conversions typically in rear — N/A
Height limit16 ft for detached ADUCan raise existing roof up to 16 ft
Lot coverageVaries by zoneExisting footprint does not count against new coverage
Fire separation1-hr fire wall if within 3 ft of property lineRequired regardless of existing structure status

Design Tips for Small Spaces

A 400–600 sq ft garage conversion can feel surprisingly spacious with the right design decisions. The biggest mistakes homeowners make are replicating a full-size house layout in a small footprint, and underinvesting in natural light. Here are the design principles that consistently produce the most livable, rentable garage conversions in LA.

Open Plan Living

Combine the kitchen, dining, and living area into one open space. Separate only the bedroom(s) and bathroom(s) with walls. This makes a 500 sq ft unit feel twice as large.

9-Foot Ceilings

If your garage has a standard 8-ft ceiling, raising it to 9 ft adds approximately $3,000–$5,000 but dramatically changes how the space feels. Worth it for any rental unit.

Bifold or Sliding Glass Doors

Replacing the garage door opening with bifold glass doors creates an indoor-outdoor connection that is highly desirable in LA's climate and commands a rental premium.

Skylights

A single tubular skylight ($800–$1,200 installed) can eliminate the need for daytime artificial lighting in a central hallway or bathroom and makes the space feel airy.

Built-In Storage

Every square foot of floor space is valuable. Built-in storage under stairs, in closets, and above the refrigerator maximizes usable area without adding footprint.

Mini-Split HVAC

Ductless mini-split systems are the standard for garage conversions. They are efficient, require no ductwork, and allow independent temperature control — a major selling point for tenants.

The 2-Bed / 1.5-Bath Layout

The most in-demand garage conversion layout in LA County is a 2-bedroom, 1.5-bathroom configuration. A 2-bed unit commands significantly higher rent than a studio or 1-bed, and the addition of a half-bath (powder room) next to the laundry area is one of the smartest functional decisions you can make for tenant livability and rental appeal.

This layout is achievable in a two-car garage (approximately 400–500 sq ft of interior space) with careful planning. The key is placing the half-bath adjacent to the laundry closet so they share a single plumbing wall — this eliminates the need for a second plumbing rough-in and keeps costs down while maximizing convenience.

Recommended 2-Bed / 1.5-Bath Layout — 480 sq ft

Open Living / Kitchen / Dining

180 sq ft

Primary Bedroom

120 sq ft

Second Bedroom

100 sq ft

Full Bathroom

45 sq ft

Half Bath + Laundry (shared wall)

25 sq ft

Entry / Hallway

10 sq ft

Key design decision: The half-bath and laundry share a single plumbing wall, eliminating a second rough-in and saving $3,000–$5,000 in plumbing costs while giving tenants the convenience of a dedicated powder room near the living area.

Unit TypeTypical LA Rent (2026)Rental Premium vs. Studio
Studio (350–450 sq ft)$1,600–$2,200/moBaseline
1 Bed / 1 Bath (450–550 sq ft)$2,000–$2,800/mo+$400–$600/mo
2 Bed / 1 Bath (500–650 sq ft)$2,500–$3,400/mo+$900–$1,200/mo
2 Bed / 1.5 Bath (480–600 sq ft)$2,700–$3,600/mo+$1,100–$1,400/mo

Utility Connections

Utility connections are the most unpredictable cost category in a garage conversion. The cost depends almost entirely on the distance from your garage to the main house's utility connections, and whether your existing electrical panel has capacity for an additional unit.

The 2-gang meter requirement: LA County and many LA cities require a separate utility meter for an ADU. This means installing a 2-gang meter socket at the property's electrical service point. Depending on your current service, this can cost $3,500–$8,000 and requires coordination with Southern California Edison — which has its own timeline and fees. Budget for this early and start the SCE application process as soon as you decide to proceed.
UtilityTypical CostKey Variable
Electrical (sub-panel + wiring)$4,500–$8,000Distance from main panel; panel capacity
2-gang meter installation$3,500–$8,000Required for separate metering; SCE coordination
Plumbing (water + sewer)$8,000–$18,000Distance from main line; slab penetration needed
Gas (if applicable)$1,500–$4,000Many conversions use all-electric — eliminates this cost
Internet / low-voltage$500–$1,500Conduit and pull wire during construction
Total utility connections$18,000–$39,500Largest range in the entire budget

Realistic Timeline

The most common mistake homeowners make is underestimating how long the permit process takes. Construction itself typically takes 8–14 weeks for a garage conversion. But from the day you hire a contractor to the day you hand keys to a tenant, the realistic timeline is 6–9 months — and that assumes no major plan check corrections.

PhaseDurationWhat Can Delay It
Hire contractor & finalize design2–4 weeksMultiple contractor bids, design revisions
Architectural plans prepared2–4 weeksComplex layouts, structural changes
Plan check submission & review4–8 weeksIncomplete submissions, correction notices
Permit issuance1 weekOutstanding fees or corrections
Construction8–14 weeksMaterial delays, subcontractor scheduling, inspections
SCE meter installation4–12 weeksSCE has its own queue — start this early
Final inspection & C of O1–2 weeksPunch list items, re-inspections
Total: hire to keys5–9 months

ROI & Rental Income

A garage conversion ADU in LA County is one of the strongest residential real estate investments available to homeowners. The combination of relatively low construction cost, high LA rental rates, and the CalHFA $40,000 grant (available to qualifying owner-occupants) creates a compelling financial case.

ScenarioTotal CostMonthly RentAnnual IncomePayback Period
Studio conversion (350 sq ft)$75,000$1,800/mo$21,600/yr3.5 years
1-bed conversion (450 sq ft)$95,000$2,400/mo$28,800/yr3.3 years
2-bed / 1-bath (500 sq ft)$115,000$2,900/mo$34,800/yr3.3 years
2-bed / 1.5-bath (500 sq ft)$125,000$3,200/mo$38,400/yr3.3 years
With CalHFA $40K grant$85,000 net$3,200/mo$38,400/yr2.2 years
CalHFA ADU Grant Program: The California Housing Finance Agency offers up to $40,000 in grant funding (not a loan — no repayment required) to owner-occupants building ADUs. Income limits apply. Skyline Builders can help you determine eligibility and submit the application as part of the project process.

Common Mistakes to Avoid

After completing dozens of garage conversions across LA County, these are the mistakes we see most often — and the ones that cost homeowners the most time and money.

Hiring a contractor without ADU permit experience

Consequence: Plan check corrections, delays, and potential code violations that are expensive to fix after construction begins.

Fix: Ask for a list of completed ADU permits in LA County. A contractor who has pulled 20+ ADU permits will navigate the process far more efficiently.

Not starting the SCE meter application early

Consequence: Southern California Edison has a separate queue for new meter installations. If you wait until construction is nearly complete, you can sit idle for 8–12 weeks waiting for SCE.

Fix: Submit the SCE application as soon as your permit is approved — or even earlier if your contractor can initiate it.

Underestimating plumbing costs

Consequence: If the garage slab needs to be cut and a new sewer line trenched to the main, costs can jump $8,000–$15,000 above initial estimates.

Fix: Have a licensed plumber scope the existing sewer line and assess the routing before finalizing your budget.

Skipping the structural engineer inspection

Consequence: Discovering mid-construction that the garage slab or walls don't meet residential code requires expensive remediation and can halt the project.

Fix: Budget $500–$1,200 for a structural engineer to review the existing structure before plans are drawn.

Choosing a layout that doesn't maximize rental appeal

Consequence: A studio conversion rents for $600–$1,000/month less than a 2-bed unit of similar size, significantly extending the payback period.

Fix: If the footprint allows it, always design for the maximum number of bedrooms the space can comfortably support.

Frequently Asked Questions

Do I need to replace the parking space I'm converting?+

No. California AB 2221 eliminated the parking replacement requirement for garage conversions. You do not need to add a new parking space when converting an existing garage to an ADU.

Can I convert a garage that doesn't meet current setbacks?+

Yes. California law allows conversion of existing nonconforming structures without bringing them into setback compliance, as long as you are not expanding the footprint. This is one of the most valuable provisions for LA homeowners with older garages close to property lines.

How long does the permit process take in LA County?+

For a straightforward garage conversion, plan check review typically takes 4–8 weeks at LA County DPRD or LA City Building and Safety. Total time from permit submission to certificate of occupancy is typically 5–8 months.

Can I convert a two-car garage into a 2-bedroom ADU?+

Yes. A standard two-car garage (approximately 400–500 sq ft of interior space) can comfortably accommodate a 2-bedroom, 1.5-bathroom layout with an open living/kitchen area. This is one of the most popular and financially rewarding conversion configurations in LA County.

Do I need a separate meter for my ADU?+

LA County and most LA cities require a separate utility meter for an ADU. This involves installing a 2-gang meter socket and coordinating with Southern California Edison. Budget $3,500–$8,000 and 4–12 weeks for SCE's installation queue.

What is the CalHFA ADU grant and do I qualify?+

The California Housing Finance Agency offers up to $40,000 in grant funding (not a loan) to owner-occupants building ADUs. Income limits apply — generally up to 120% of the Area Median Income for your county. Contact Skyline Builders to check your eligibility.

Can I rent my garage conversion on Airbnb?+

Short-term rentals of ADUs are subject to LA City and county short-term rental ordinances. In most cases, you must register as a short-term rental host and the ADU must be your primary residence. Long-term rentals (30+ days) have no such restrictions.